Nevada Petroleum & Geothermal Society Dinner Meeting: Thursday, November 6, 2014

A note from NPGS: Come and join us Thursday evening, November 6th, at the Ramada located at 1000 East 6th Street, Reno, for a presentation by Bill Price, Head of Engineering at Enel Green Power North.

Speaker: Bill Price, Head of Engineering and Construction
Enel Green Power North America, Inc.

Topic: Enel’s Stillwater Hybrid Power Plant

Where: Ramada Reno Hotel; 6:30 PM
1000 East 6th Street, Reno, NV 89512
Cocktail Reception 6:30, Skyline Bar, 14th Floor

HOSTED BY: Barbour Well Inc., Oil and Geothermal Drilling Services

Dinner Served at 7:00 PM

NPGS Members $20; Non-Members $23; Students $10

Please RSVP by Wednesday Nov 5 with the following link:
https://docs.google.com/forms/d/1VMFrgsqja_Aucjvh4kNRgxS4MepS706lRKPsn6Qwp20/viewform

Keep in mind that NPGS is charged for every meal that is reserved. If you cannot keep your reservation, please cancel prior to the meeting.

More information: William Price is the Vice President of Geothermal Engineering and Construction at Enel Green Power North America, Inc. (EGP-NA) responsible for the execution of geothermal projects in North America. He joined EGP-NA in 2007.

Mr. Price was the Project Manager for the construction and commissioning of the Stillwater and Salt Wells Geothermal Projects located in Fallon, Nevada, which were placed in service in 2009. Currently, he is leading the engineering and construction of solar projects integrated with EGP-NA’s geothermal facilities.

Mr. Price has 29 years of experience in the power industry, the past 23 specifically involved in geothermal business development, operations, maintenance, engineering and construction. He began his career in the U.S. Navy in 1982, and graduated at the top of his class in the Nuclear Power Program. After completing his government service, Mr. Price became involved with the Coso Geothermal Field and was part of the construction and operations team that expanded Coso from a 30 MW dual flash steam facility to a 240 MW project spread over four different sites. In 1992 he became the general manager of the 24 MW Steamboat Binary Geothermal Project.

Price is well known in the industry as the pioneer of geothermal submersible pump technology and advancements in binary technology.

Taken From: EnelGreenPower.com Company Organization Chart
http://www.enelgreenpower.com/en-GB/ena/company/chart/

Leave a Reply